List of budget investments and budget investment projects implemented by the Ministry of Energy of the Republic of Kazakhstan

List of budget investments and budget investment projects implemented by the Ministry of Energy of the Republic of Kazakhstan in 2018

The name of budget investments / budget investment projects

Realization period

Project Status

1

"Development of railway junction Astana, including the construction of a railway station complex ", located in Astana

2013-2018

Passing on 2018, on May 31, 2017, the opening of the railway station "Nurly Jol" was held.

2

"Construction of second tracks on the section of Almaty - Shu"

2015-2018

Passing on the year 2018.

 

On November 27, 2017, the movement of trains along the second tracks of the Almaty-1-Shu section was opened. In the second half of 2018, the completion of the remaining 3 overpasses under Art. Saz, Espe, Kazybek Beck.

3

"Construction of a ferry crossing in the port of Kuryk", located in the Karakiyansky district, in the village of Kuryk

2015-2018

 Passing on the year 2018.

 

On December 6, 2017, the Head of State, during the Day of Industrialization in the regime of the Public Space Bridge, started the work of the logistics facility (automobile crossing) of the multifunctional ferry complex Kuryk. Completion of Phase 2 facilities is scheduled for 2018

4

"Construction of FEZ infrastructure facilities" National Industrial Petrochemical Technopark ", located in Atyrau region

2014-2020

 Under the GTES project, construction and installation work and installation of technological equipment are under way. All the main technological equipment has been delivered to the construction site.

 

Under the Teghgazy and Water treatment project, and other objects of the FEZ, a positive conclusion was obtained by the RSE "Gosexpertiza" on the adjusted feasibility study of the FEZ NINT, which includes, inter alia, the breakdown of the construction of facilities and the impact of devaluation.

 

At the moment, budgetary procedures are being implemented to develop and adjust the integrated PEO for these projects, within the framework of which a redistribution of previously allocated funds for the Water Treatment and GTPP project is expected.

5

"Construction of an industrial (industrial) engineering infrastructure for a poultry farm to grow broilers with a capacity of 60,000 tons per annum live weight per year in the Bulandynsky district of the Akmola region (networks and power supply facilities, low-voltage networks)

2016-2018

The project is under implementation, construction and installation work is under way.

6

"Construction of an industrial (industrial) engineering infrastructure for a poultry farm to grow broilers with a capacity of 60,000 tons per annum live weight in the Bulandynsky district of the Akmola region (networks and water supply facilities)"

2016-2018

The project is under implementation, construction and installation work is under way.

7

"Construction of industrial (industrial) engineering infrastructure for a poultry factory for growing broilers with a capacity of 60 thousand tons in live weight per year in the Bulandynsky district of the Akmola region (networks, drainage facilities, treatment facilities)"

2016-2018

The project is under implementation, construction and installation work is under way.

8

"Construction of infrastructure for a full-cycle auto plant for the production of auto components in the city of Ust-Kamenegorsk in the East Kazakhstan region"

2016-2018

The project is under implementation, construction and installation work is under way.

9

Creation of an industrial zone in the city of Kostanay with the necessary infrastructure

2016-2018

The project is under implementation, construction and installation work is under way.

10

"Construction of a complex of facilities for water supply of the" Syrymbet "mine in the Ayyrtausky district of the North-Kazakhstan region within the framework of the Unified program for business support and business development" Road map of business 2020 "

2017-2018

The project is under implementation, construction and installation work is under way.

11

"Construction of a railway access road with in-site development and engineering networks of JSC" Syrymbet "in the Ayyrtausky district of the North-Kazakhstan region in the framework of the Unified program of business support and business development" Road map of business 2020. I stage"

2017-2018

The project is under implementation, construction and installation work is under way.

12

"Electrospection of the production base located in Atyrau city, Atambaev street, 60" LLP "ZhigerMunaiServis"

2018

The project is under implementation, state purchases for construction and installation work are being carried out.

13

Construction and development of a new neighborhood in the 22nd quarter in the city of Khromtau "(reconstruction of the highway from the highway" Border of the Russian Federation (to Samara) - Shymkent "km 835 + 575 to Abay avenue)

2017-2018

The project is under implementation, is being completed in 2018 at the expense of the local budget.

14

Construction of in-line and intra-quarter engineering networks to 107 residential houses in the district # 8 Satpayev

2017-2018

The project is at the implementation stage, completed in 2018.

15

Reconstruction of streets in the city of Ridder, East Kazakhstan region

2017-2019

The project is under implementation, the completion is planned for 2019.

16

6 kV transmission line from Ridder to West-Altai Nature Reserve

2017-2019

The project is under implementation, the completion is planned for 2019.

17

The city of Karaganda. Reconstruction of the heating main M-8. Prishakhtinsk.

2012-2018

The project is under implementation, is being completed in 2018 at the expense of the local budget.

18

Completion of modernization of existing technological schemes of sewage treatment facilities in Petropavlovsk, North-Kazakhstan region - 4 stage of reconstruction (adjustment)

2013-2018

The project is at the implementation stage, completed in 2018.

19

Construction of an administrative building with a garage for 16 cars on the street. Aiteke, 25, Aktobe

2017-2018

The project is under implementation, the completion is planned for 2019